International City Pakage - 2

Construction Sites

Worked and completed NAKHEEL's International City Chinamex Apartment (Package 2 JAP015-4/2 12 Buildings) as a site engineer which lasted from JAN-2004 to DEC-2004 and during that time I had the duties of:

  • Preparations & following the RFI (request for inspection).
  • Preparation of monthly payments.
  • Following the Shop drawing to match the regulations and approved standards.
  • Preparation of Electrical Load Schedules.
  • Daily Report of man power and site progress.
  • Implementation and coordination of shop drawings of the electrical services with the other services (HVAC/PLUMPING).
  • Following the site requirements of marital and man power.
  • Following the requirements of DEWA and DIC and other authorities from approval of site works.